Files
TeslaRel410/ALPHA_1/VWETEST/VGLTEST/DIVISION/DASP_POS.TXT
T
CydandClaude Fable 5 504aef88d4 ALPHA_1: commit the live production-system working tree
Un-ignored: this is the working copy the emulator actually boots (patched
BTL4OPT.EXE v4 lineage + .orig/.nop14/.pre_idle/.pre_limit backups,
TESTARN.EGG arena1 test egg, REL410 BT+RP trees, VGL_LABS pod boot bats,
VWETEST factory test suites, SB16 Creative utilities). The pristine
untouched image remains ALPHA_1.zip.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-04 19:40:34 -05:00

25 lines
892 B
Plaintext

MAIN MONITOR SYNC ADJUSTMENT, ASPECT RATIO, AND POSITION TESTS.
- Main Monitor adjustments:
Horizontal sync adjustment is only nessary if the image is scrolling.
Turn the pad VR708(H. Sync. Delay-located on the main board) in both
directions untill the screen rolls. Set the Pad in the center of this
range.
Vertical sync adjustment is only nessary if the image is scrolling.
Turn the pad VR604(V. Freq.-located on the main board) in both directions
untill the screen rolls. Set the Pad in the center of this range.
To adjust horizontal position use pad VR700(H. Delay) on the overhead
Main Monitor control board.
To adjust vertical position use pad VR603(V. Center) on the overhead
Main Monitor control board.
To adjust aspect ratio use pads VR601(V. SIZE) and, VR704(H. SIZE) on
the overhead Main Monitor control board.
PRESS C - To Exit