RC1 acceptance PASS: E0000305 after check — edit 6 verified on both paths
Over-threshold check exchange repaints and re-renders a live E0 readout (not the stale 04000000). The +2 drift in $3184 among 65 status frames refines the counter model: $3184 = started timeout-retry sequences (give-ups are the exhausted subset); timeout-recovered cycles exit via the success teardown, NAK-recovered ones via $DA2F ($3185). All observations from both bench sessions fit. Mash spot-check remains before christening RIO 4.3. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
+14
-4
@@ -531,8 +531,18 @@ first counter event — `04000000` flashes momentarily, then `E000000x`
|
|||||||
as errors accrue and the reply-latch wedge trips under load. The wedge
|
as errors accrue and the reply-latch wedge trips under load. The wedge
|
||||||
fix plus the E0 threshold gate are what exposed the stale frame.
|
fix plus the E0 threshold gate are what exposed the stale frame.
|
||||||
|
|
||||||
**RC1 first-light (burned 2026-07-19): PASS on the below-threshold
|
**RC1 acceptance (burned 2026-07-19): PASS on both edit-6 paths.**
|
||||||
path** — a version+check exchange now leaves the display at `F0000000`.
|
Below threshold: a version+check exchange leaves the display at
|
||||||
Remaining for the RIO 4.3 christening: over-threshold check repaint
|
`F0000000`. Over threshold: the full `--e0test` sequence reproduced the
|
||||||
(must re-render the E0 readout), `--e0test` regression, mash
|
certified behavior (held `F0000000` through four sub-threshold events,
|
||||||
|
flipped at the 5th teardown), and the closing CheckRequest — 65 status
|
||||||
|
frames — left the display at **`E0000305`**: repaint + live E0
|
||||||
|
re-render, not the stale `04000000`. The `$3184`=03 (vs predicted 01)
|
||||||
|
pins down the counter semantics one notch further: two of the 65 check
|
||||||
|
frames hit a timeout-retry that our late ACK then rescued — so
|
||||||
|
**`$3184` counts started timeout-retry sequences** (give-ups are the
|
||||||
|
subset that exhaust all 5 retransmits), and a timeout-recovered cycle
|
||||||
|
exits via the success teardown (no `$3185`), while NAK-recovered cycles
|
||||||
|
tear down through `$DA2F` (`$3185`). Every observation from both bench
|
||||||
|
sessions fits this model. Remaining for the RIO 4.3 christening: mash
|
||||||
spot-check.
|
spot-check.
|
||||||
|
|||||||
Reference in New Issue
Block a user